tunnelintelligence
tunnelintelligence
Awards
France
Lyon - fr/72
Road
16.03.2010
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
Switzerland
Canton of Schwyz - ch/68
Motorways
16.03.2010
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
Switzerland
Canton Glarus - ch/64
Highway
16.03.2010
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
Italy
South Tyrol - it/163
Highway
16.03.2010
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...


Prequalifiers
Italy
National - it/158
Railways
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
Pakistan
Karakorum - pk/22
Railway
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
China
Hong Kong - cn/82
West Island Line
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.


Awards

Vietnam Giang Province - vn/18 Hydro Power 25.06.2007

Cavico Corporation announced in May that Cavico Bridges and Tunnel Company, a wholly-owned subsidiary, signed an agreement valued at approximately USD20.7 million to construct a headrace tunnel, surge tank, and intake for the Thai An hydropower plant, 200 km north of Hanoi. The project includes a 3,800 m-long headrace tunnel, 5.2 m bored diameter and 4.5 m completed diameter. The surge tank is a 75 m, 11 m bored diameter and 10 m inner diameter vertical shaft. There is also a 133 m inclined penstock tunnel at 70 degree inclination.
According to investigation data provided by the owner, the path is based in granite rock with highly hardness and massive, few location of weak zone anticipated at the geological faults crossing the headrace tunnel.
Cavico B&U proposed to bore all the tunnel by drill and blast method with an Atlas Copco drill rig H282 or equivalent. The excavated rock will be mucked out by wheel loader and dumptruck. For the inclined penstock, the contractor proposes using a raise boring machine for reaming at 1.8 m diameter. The excavation then shall be carried out downward by drill and blast.
During excavation stage, the tunnel will be temporary supported with shotcrete (with and without reinforced wiremesh), rockbolt and H beams where required. A sliding formwork carriage will be used for tunnel lining concreting and climbing formwork (jump form) for the surge tank. Construction is expected to commence very soon. The company estimates the project should be completed within 25 months. Cavico Corporation announced in May that cavico bridges and Tunnel company