France Lyon - fr/72 Road
16.03.2010 |
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
|
Switzerland Canton of Schwyz - ch/68 Motorways
16.03.2010 |
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
|
Switzerland Canton Glarus - ch/64 Highway
16.03.2010 |
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
|
Italy South Tyrol - it/163 Highway
16.03.2010 |
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...
|
Italy National - it/158 Railways |
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
|
Pakistan Karakorum - pk/22 Railway |
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
|
China Hong Kong - cn/82 West Island Line |
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.
|
|
Awards
Greece Peloponnese - gr/33 Highway |
13.11.2007 |
The Apion Kleos consortium, led by VINCI with 36%, signed in end July the contract with the Greek government for the Athens-Tsakona motorway, the country’s biggest motorway concession project. The contract has yet to be ratified by the Greek parliament. The expected start of the concession is April 2008. The other members of the consortium are Hochtief of Germany (25%) and three Greek companies, namely Elliniki Technodomiki-Aktor (18%), J&P-Avax (18%) and Athena (3%). The project calls for the financing, design, construction and/or repair of 365 km of toll motorway between Athens and Tsakona in the southwest of the Peloponnese, via Corinth and Patras. This breaks down into 82 km of existing motorway, 120 km to repair and widen, and 163 km to build. The project also calls for operating the motorway for 30 years. Visit www.vinci.com, www.hochtief-construction.de, www.etae.gr and www.jp-avax.gr
The project includes nine tunnels: Xylokastro (163 m /158 m), Derveni (655 m / 645 m), Mavra Litharia (1,224 m / 1,225 m), Akrata (839 m / 305 m), Platanos (1,932 m / 1,605 m), Panagopoula (five tunnels of 338 m, 132 m, 556 m, 4,018 m and 3,182 m), Aghios Georgios (386 m / 352 m), Koliri (348 m / 296 m) and Elia (238 m / 187 m). The tunnels of less than 600 metres will be 12.75 m wide at their base and 7.5 m high to the crown. The tunnels of more than 600 metres will be 10.25 m wide at the base and 7 m high to the crown. Drilling and blasting will be used as per the NATM principles. Rock haulage will be done by trucks. Click here for more info on the tunnels. Work is scheduled to commence in September 2008. The estimated cost of the tunnels amounts to EUR203 million for civil works and EUR46 million for E&M equipment (value 2006, design and ground investigation not included). 46/07.

|
|
|