France Lyon - fr/72 Road
16.03.2010 |
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
|
Switzerland Canton of Schwyz - ch/68 Motorways
16.03.2010 |
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
|
Switzerland Canton Glarus - ch/64 Highway
16.03.2010 |
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
|
Italy South Tyrol - it/163 Highway
16.03.2010 |
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...
|
Italy National - it/158 Railways |
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
|
Pakistan Karakorum - pk/22 Railway |
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
|
China Hong Kong - cn/82 West Island Line |
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.
|
|
Awards
Spain Andalusia - es/145 Railway 2 contracts |
22.04.2008 |
Negotiated invitation to tender, deadline 22nd April, 2007 for construction of lots A and B of the Las Lagunas-Cala de Mijas section on the Costa del Sol rail line. This section includes a 2 x 4 km tunnel. The two parallel tunnels will be bored using a pair of TBMs working towards La Cala de Mijas from the Fuengirola river.
The time frame to complete the two contracts is 42 months. The first contract includes a shaft for the two TBMs, the electrical supply of the TBMs, the seaside, left tunnel, the cross passages to the parallel tube, a ventilation shaft, UIC track laying in the two tunnels and environmental restauration works. The second contract involves the hillside, right tunnel, the diaphragm wall station box for the future underground station in La Cala de Mijas, its internal structure and the external urban arrangements.
The Costa del Sol rail line will enable high capacity trains with speeds of 220 to 250 km/h and suburban trains. The high capacity trains will provide very competitive services compared to private vehicles, with just 11.5 minutes from Estepona to Marbella and 10 minutes from Marbella to Fuengirola. The Ministry of development is responsible for the Fuengirola-Malaga section. So far, two thirds of the 30.4 km existing line has been dualled. The Andalusian regional government is in charge of the 56.6 km Estepona-Fuengirola section, which will run in majority underground in dense urban areas. Read E-News Weekly 10/2007 & 50/2003. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52060-2008 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52059-2008, OJ S 38, or contact Ferrocarriles de la Junta de Andalucía, Sevilla, fax +34 955007573. E-mail carmen.camacho@ferrocarrilesdeandalucia.es 12/08.
Open invitation to tender, deadline 20th May, 2008 for site supervision during construction of the Las Lagunas-Cala de Mijas section on the Costa del Sol rail line, including a 2 x 4 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=66452-2008, OJ S 48, or contact Ferrocarriles de la Junta de Andalucía, Sevilla, fax +34 955007573. E-mail carmen.camacho@ferrocarrilesdeandalucia.es 12/08. |
|
|