France Lyon - fr/72 Road
16.03.2010 |
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
|
Switzerland Canton of Schwyz - ch/68 Motorways
16.03.2010 |
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
|
Switzerland Canton Glarus - ch/64 Highway
16.03.2010 |
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
|
Italy South Tyrol - it/163 Highway
16.03.2010 |
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...
|
Italy National - it/158 Railways |
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
|
Pakistan Karakorum - pk/22 Railway |
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
|
China Hong Kong - cn/82 West Island Line |
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.
|
|
Awards
The following awards of contracts have been made over the last year. Project updates will appear on the front page at www.tunnelbuilder.com where the permanent record of progress will be maintained in the Archive files. Details of progress, methods and equipment used should be reported to olaia@tunnelbuilder.com for publication.
Norway Oslo - no/85 Water |
9.01.2008 |
Norconsult pocketed a NOK2.9 million contract for consultancy services for the water transfer from Langlia and Holsfjorden to Oset in Maridalen, possibly in tunnel. Click no/85 for more. Visit www.norconsult.no 02/08. |
Belgium Antwerp - be/22 Ring Road |
9.01.2008 |
The Noriant consortium formed by VINCI, as lead company, through VINCI Concessions (35%) and CFE and its subsidiaries, Aanneming Van Wellen and Dredging International (14%), in association with Besix (25%), Cordeel ZT (11%), Fabricom GTI (10%) and Victor Buyck Steel Construction (5%), has been declared preferred bidder for the concession to operate the Oosterweelverbinding by BAM (Beheersmaatschappij Antwerpen Mobiel), |
France Bordeaux-Lyon - fr/45 Highway |
3.01.2008 |
Scetauroute and Jean Muller International (JMI) received a EUR22 million contract for studies and construction supervision for the Violay, Bussiere and Chalosset tunnels on section Balbigny - La Tour-de-Salvagny on highway A89. Click fr/45. Visit www.scetauroute.fr and www.jmi.groupegis.com 31-32/06. |
United Kingdom Surrey -uk/37 Highway Bypass |
27.12.2007 |
Sandvik will supply Balfour Beatty with three DT820-AC twin boom tunnelling jumbos for the 2 x 1.9 km Hindhead tunnel project, which will complete the dual carriageway link between London and Portsmouth, in the west. Click here. Visit www.sandvik.com 52/07-01/08. |
Turkey Provinces of Kocaeli, Sakarya and Bilecik - tr/33 High Speed Railway |
27.12.2007 |
A consortium of Cengiz, IC Ictas and Belen consortium will build 39 bored tunnels totalling 39.1 kilometres and three cut-and-cover tunnels, with a total length of 1,550 metres, on the 158 km second stage of the 533 km high speed railway between Ankara and Istanbul. The bored tunnels will be drilled and blasted. The consortium of builders ordered from Atlas Copco 13 L2D underground drill rigs and two D7 surface crawler rigs. The longest tunnel spans 4,960 metres. Click here. Visit www.cengizgroup.com.tr, www.ictas.com.tr, www.belen.com.tr and www.atlascopco.com 52/07-01/08. |
Spain Madrid - es/135 Railway |
27.12.2007 |
Construction of the 15 km railway line that will link Móstoles and Navalcarnero has been commissioned to OHL for EUR362.3 million and a time frame of 30 months. The Móstoles-Navalcarnero line will run underground on 46% of its alignment and will serve seven stations: four in Móstoles, one in Arroyomolinos and the last two in Navalcarnero. OHL will operate the line for 20 years. Visit www.ohl.es and www.ohlconcesiones.com 52/07-01/08. |
Spain Malaga - es/126 Highway |
27.12.2007 |
The Las Pedrizas toll highway AP-46 is intended to solve the saturated traffic situation on the main northern access to Malaga. The project has made a significant step forward further to the Ministry of development's decision to aprove 99% of the alignment presented by the concessionaire appointed for the construction and operation of the écheme. The concessionaire includes Itinere (70%), Sacyr (10%), respectively the infrastructure concession company and the construction firm of Sacyr Vallehermoso, and GEA 21 (20%). |
Spain Madrid-Valladolid - es/56 High Speed Railway |
27.12.2007 |
Idom Internacional bagged a EUR2.4 million contract for site supervision and work inspection during construction of the east bypass railway for freight trains in Valladolid on the Madrid-Valladolid high speed line. The 17.5 km line includes a 2 km cut-and-cover tunnel. Visit www.idom.es 52/07-01/08. |
Poland Warsaw - pl/11 Metro |
27.12.2007 |
Metro Warszawskie, the Warsaw metro company, selected a joint venture of Metroprojekt and Andrzej M. Cho?dzynski (AMC), an architectural office, for the conceptual design of the central section of Warsaw's second metro line from Daszynski roundabout to Wilenski railway station. This 6 km section includes a crossing of the Vistule river. More in E-News Weekly 50/2007. Visit www.metro.waw.pl, www.metroprojekt.pl and www.amcholdzynski.pl 52/07-01/08. |
Pakistan Kashmir - pk/21 Hydropower |
27.12.2007 |
Pakistan's federal government approved the 969 MW Neelum-Jhelum hydropower project at a cost of PKR128.4 billion in Pakistan-controlled Kashmir. The project will be built by a consortium consisting of China Gezhouba Group Corp. (CGGC) and CMEC China. The Water and Power Development Authority (WAPDA) had already approved award of the contract to the CGGC-CMEC joint venture in March 2007 at the contract price of PKR90.9 billion. |
India Uttaranchal - in/35 Hydro |
27.12.2007 |
National Thermal Power Corp (NTPC) has awarded Patel Engineering the construction contract for key civil works on the 520 MW Tapovan Vishnugad hydropower project. The value of the contract is INR4.3 billion, and the contract period is 48 months. The scope of the work includes construction of the surge shaft, pressure shaft, penstock, tailrace tunnel, switchyards and the power house. The plant will house four 130 MW units. The headrace tunnel was awarded last year to Larsen & Toubro and Alpine Mayreder. Click in/35. Visit www.patelengineering.com 52/07-01/08. |
India New Delhi - in/11 Metro |
27.12.2007 |
Hindustan Construction Company (HCC) has bagged a INR2.97 billion contract in joint venture with Alpine Mayreder from the Delhi Metro Rail Corporation (DMRC). HCC has a 49% share of the value (INR1.45 billion). The contract covers the design and construction of a 2.6 km-long NATM tunnel between Talkatora Garden and Budha Jayanti Park stations, with a finished internal diameter of minimum 10 m for twin track railway, including access and ventilation shaft. It also includes external and temporary works for the metro rail transmission system link between Talkatora Garden and Budha Jayanti Park. This project is part of the Airport Metro Express Line and it has to be completed by 15th July, 2010. In September 2007, HCC in joint venture with Alpine Mayreder and Samsung Corporation had received a design and construction contract of two stations and a tunnel between New Delhi and Talkatora Garden stations. Click in/11. Visit www.hccindia.com and www.alpine.at 52/07-01/08. |
Hungary Baranya - hu/13 Highway |
27.12.2007 |
Mecsek Autopalya, a consortium led by Strabag, scooped a HUF266.1 billion (EUR1,048 million) contract in a tender to build and operate a new section of motorway M6. Other members of the consortium are French firms Bouygues Travaux Publics and Colas, as well as John Laing Infrastructure of the UK and Hungary's Intertoll Europe. Strabag's share amounts to EUR460 million. The tender refers to a total 78 km motorway section, including the section of the M6 northsouth-bound motorway between Szekszard and Boly, as well as the M60 motorway branching off from Boly to connect with the city of Pecs. The contract value includes the building, financing, maintenance and operation of the motorway for a 30-year period, with the project to take the form of a public-private partnership (PPP). Work on the motorway is expected to start before the end of the year, with completion scheduled for the spring of 2010. The M6 motorway currently runs from Budapest to Dunaujvaros. It is part of the trans-European corridor Vc that links Budapest to Sarajevo. The section includes four tunnels (1,331 m, 399 m, 865 m and 418 m). Construction officially started in November for completion in spring 2010. Visit www.strabag.com, www.bouygues-construction.com, www.laing.com and www.intertoll.eu 52/07-01/08. |
Germany Baden-Wuerttemberg - de/69 Highway |
27.12.2007 |
Duerr scooped a EUR5.3 million contract to supply and install the E&M equipment in the 1,080 m-long Leutenbach tunnel. Visit www.duerr-gruppe.de 52/07-01/08. |
China Hong Kong - cn/19 Sewage |
27.12.2007 |
The Drainage Services Department has awarded on 4th December, 2007 the construction of the 5 km Tsuen Wan drainage tunnel in Kowloon to a group of companies formed by Maeda Corporation, China Railway Engineering Corporation (CREC) and SELI. The commencement date of the works of the contract will be on 28th December, 2007. The main tunnel is 5.13 km long and 6.5 m internal diameter and there will also be two adits, 45 m and 19 m in length and 4.6 m and 5.5 m internal diameter respectively, three intake structures and two intakes with drop shafts. The diameter of the shafts is 5 m and 5.5 m respectively. The tunnel will be driven mainly in hard rock by a TBM. Visit www.maeda.co.jp/english/outline_e.html, www.crecg.com and www.selitunnel.com or www.selitecnologie.com 52/07-01/08. |
|
|