tunnelintelligence
tunnelintelligence
Awards
France
Lyon - fr/72
Road
16.03.2010
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
Switzerland
Canton of Schwyz - ch/68
Motorways
16.03.2010
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
Switzerland
Canton Glarus - ch/64
Highway
16.03.2010
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
Italy
South Tyrol - it/163
Highway
16.03.2010
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...


Prequalifiers
Italy
National - it/158
Railways
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
Pakistan
Karakorum - pk/22
Railway
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
China
Hong Kong - cn/82
West Island Line
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.


Awards

The following awards of contracts have been made over the last year. Project updates will appear on the front page at www.tunnelbuilder.com where the permanent record of progress will be maintained in the Archive files. Details of progress, methods and equipment used should be reported to olaia@tunnelbuilder.com for publication.

United States
Texas - us/51
Austin
Floodwater
15.09.2007
The Austin city council approved Phase 2 and Phase 3 of the Waller Creek tunnel project, which includes funding for design, bidding and construction. The USD28.3 million design contract went to a joint venture between Kellogg, Brown and Root (KBR) and Espey Consultants. That process is expected to be complete in 2010. The build portion will include an estimated USD100 million contract for construction of the project. Construction is expected to take place from 2010 to 2014. Click here. Read E-News Weekly 26/2007, 16/2007, 34/2006, 27/2006, 32/2003, 22/2003, 20/2003 & 12/2003. Visit www.kbr.com and www.espeyconsultants.com 38/07.

United States
Texas - us/51
Austin
Floodwater
15.09.2007
The Austin city council approved Phase 2 and Phase 3 of the Waller Creek tunnel project, which includes funding for design, bidding and construction. The USD28.3 million design contract went to a joint venture between Kellogg, Brown and Root (KBR) and Espey Consultants. That process is expected to be complete in 2010. The build portion will include an estimated USD100 million contract for construction of the project. Construction is expected to take place from 2010 to 2014. Click here. Read E-News Weekly 26/2007, 16/2007, 34/2006, 27/2006, 32/2003, 22/2003, 20/2003 & 12/2003. Visit www.kbr.com and www.espeyconsultants.com 38/07.

France
Marseille - fr/17
Metro
7.09.2007
Systra pocketed a EUR2.3 million contract extension for assistance to the owner as part the extension of Line 1 between La Timone and La Fourragère and the refurbishment of the Noailles tunnel for the tramway. Visit www.systra.com 37/07.

China
Gansu Province - cn/79
Water
7.09.2007
CMC of Italy has signed a EUR42.5 million contract for the execution of Tunnel #9, which is part of the Yintao water supply project, comprising more than 200 km of tunnels. Tunnel #9 has a length of 18.3 km, an excavation diameter of 5.75 metres and a finished diameter of 4.96 metres. The contract has been awarded to the Gansu Zhongyi joint venture formed by CMC and Sinohydro Engineering Bureau No. 4. The tunnel will be executed in 65 months using a TBM for the excavation and the subsequent lining made up of precast segments. The project is located in the province of Gansu, 130 km from the town of Lanzhou, where CMC already executed, at the end of eighties, the Yindaruqin irrigation project. Visit www.cmc.coop 37/07.

China
Guangdong - cn/14
Shenzhen
Metro
31.08.2007
Shanghai Tunnel Engineering Co. (STEC) has won a CNY530 million contract from the Shenzhen metro corporation for the construction of a 4.8 km section of Line 2. About three kilometres of tunnel will be built by tunnel boring machine.

China
Zhejiang - cn/78
Hangzhou
Metro
31.08.2007
Shanghai Tunnel Engineering Co. (STEC) has been awarded a CNY279 million contract in Hangzhou for the design and construction of running tunnels between Binjiang station and the Fuchun Street station on Line 1 of the Hangzhou metro. Read E-News Weekly 36/2007. Visit www.stec.net or www.tunnelling.cn 36/07.

Italy
Bologna - it/76
Metro
Line 1
31.08.2007
A joint venture headed by Geodata, with Tecnicoop, Siteco, Policreo and Ineco as partners, won the tender to carry out the final design of Phase 1 of the metrotram in Bologna, offering a discount of EUR625,000, or 25% less than the tender estimate of EUR2.5 million. The contract is for construction design for the 3.5 km, first lot from Fiera Michelino to the central railway station and preliminary design up to Maggiore Hospital.

Malaysia
Negeri Sembilan - my/18
Water
31.08.2007
Zecon Engineering received a letter in July 2007 from the Jabatan Bekalan Air Negeri Sembilan, the Department of water supply in Negeri Sembilan state, accepting the company's tender for construction of the Triang transfer tunnel and associated works (package 1, scheme B) for an amount of MYR125 million.

Singapore
Downtown - sg/23
Metro
31.08.2007
Excavation and structural work on the SGD12 billion Downtown Line (DTL) will be started during the last quarter of 2007. The Land Transport Authority (LTA) awarded contracts for Phase 1 of the DTL worth nearly SGD500 million to three construction firms which have extensive experience in large-scale projects in Singapore.

South Korea
Seoul - kr/26
Highway
31.08.2007
Samsung Engineering and Construction is leading a group of six other South Korean contractors that submitted proposals to the Seoul metropolitan city government at the end of June for the KRW570 billion construction of a tunnel under the Han river.

Spain
Catalonia - es/57
Highway
31.08.2007
Indra pocketed a EUR4.6 million contract to supply and install safety and control systems in the Juan Carlos I tunnel in Viella in Lerida province. The new tunnel, located on the Vilaller-Viella section of trunk road N-230, will be equipped with the most modern safety and control systems, including signage, video monitoring, video detection, telephone and videoconference, IP communication network, fire detection, radio communication, SOS stations and ventilation and lighting control.

Spain
Bilbao - es/118
South Metropolitan Bypass
31.08.2007
Euskontrol bagged a EUR1.3 million contract for work control and site supervision for section 4 Trapagaran-Gotostiza, section 5 Gorostiza-Kadagua, section 7 Kadagua-Peñascal and section 8 Peñascal-Larraskitu of the south metropolitan bypass, a new highway to relieve the A-8 in Bilbao. Section 4 includes the Argalario and Mesperuza tunnels, respective lengths of 1,816 m / 1,794 m and 538 m / 590 m. Section 5 includes the Santa Agueda tunnel (1,980 m / 1,964 m). Section 7 includes the Arraiz tunnel (2,261 m / 2,263 m) and a 247 m tunnel at the exit to Kadagua. Section 8 includes the Larraskitu tunnel (831 m / 894 m). Visit www.euskontrol.com 36/07.

Denmark
Copenhagen - dk/12
Metro
28.08.2007
GEO and Per Aarsleff have been contracted to undertake a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations of the planned Circle Line. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings.

Spain
Basque Country es/100
High Speed Railway
28.08.2007
Euroestudios and Fulcrum teamed up to get a EUR4.3 million contract for site supervision and work inspection during construction of the Lemoa-Galdakao and Galdakao-Basauri high speed rail sections in Biscay province. The 5.4 km Lemoa-Galdakao section includes the 1,820 m-long Galdakao tunnel. The 3.6 km Galdakao-Basauri section includes a 2,728 m-long tunnel. Visit www.euroestudios.es and www.fulcrum.es 35/07.

Germany
Hamburg - de/67
Metro
19.08.2007
The executive design and construction of a 3.95 km section of Line 4, whereof approx. 2 x 2.8 kilometres of TBM-driven single-track tunnels and two stops, have been commissioned to a joint venture of Hochtief, Zueblin, Prien and H.C. Hagemann. Visit www.hochtief.de and www.zueblin.de 34/07.