France Lyon - fr/72 Road
16.03.2010 |
The consortium Spie Sud Est/Yvroud Europeenne des Fluides, Feyzin secured the EUR7.6 million contract for equipment maintenance in the Grand Lyon tunnels, the most important of which are Fourviere (1,850 m), Croix-Rousse (1,750 m), Brotteaux-Servient and Vivier-Merle (336 m). For more, contact Communaute Urbaine de Lyon, fax +33 478 957097, or visit http://marches.grandlyon.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058386-2010. 11/10...
|
Switzerland Canton of Schwyz - ch/68 Motorways
16.03.2010 |
Gähler und Partner AG of Ennetbaden have secured the EUR2.28 million contract for PM designer for safety refurbishment in 1.14 km-long Mosi tunnel on A4, near Brunnen. Contact OFROU, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062920-2010. 11/10...
|
Switzerland Canton Glarus - ch/64 Highway
16.03.2010 |
IG BP2, c/o Bänziger Partner AG of Zurich, secured the EUR2.63 million contract from BAMO for 5.7 km-long N3 Kerenzer tunnel. Contact OFROU, Winterthour, tel +41 522344-711, fax -790, e-mail winterthur@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062921-2010. 11/10..
|
Italy South Tyrol - it/163 Highway
16.03.2010 |
Construction contract for Kuechelberg tunnel awarded to PAC SpA consortium, value EUR34,695,272 excluding VAT. More from PAC in Capo di Ponte, tel +39 0364331037, fax +39 036442303, e-mail info@pacspa.it and client APB in Bozen, tel +39 04714125-14, fax –39, e-mail gare-11.5@provincia.bz.it Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071475-2010. 11/10...
|
Italy National - it/158 Railways |
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
|
Pakistan Karakorum - pk/22 Railway |
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
|
China Hong Kong - cn/82 West Island Line |
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.
|
|
Bids
China Hong Kong and Guangdong - cn/81 High Speed Railway |
18.09.2008 |
Expressions of interest, deadline 18th September, 2008 for detailed design for tunnels and associated structures for the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong express rail link. The section from Guangzhou to Shenzhen will start operation in 2010. The Hong Kong section will use a dedicated corridor in tunnel. Plans call for the construction of a 26 km tunnel from the existing west Kowloon rail terminal to the Hong Kong-Shenzhen boundary at Huanggang. Construction is due to start in late 2009 for completion in 2014 or 2015. Expressions of interest are invited from suitably qualified combined multi-disciplinary consultants in the disciplines of civil and structural engineering, architectural, building services engineering and quantity surveying, together with specialist input as appropriate from other disciplines including environmental, acoustics, lighting, system assurance, traffic, fire engineering and landscaping. The detailed design for the tunnels and associated structures will be split into two major packages, with appointments being made in early 2009. Agreement C802 is for the design of the tunnels and associated structures (South) between West Kowloon Terminus (WKT) and Pat Heung Vent Building. This is an alignment length of approximately 15 km. Agreement C803 is for the design of the tunnels and associated structures (North) between Pat Heung Vent Building and the boundary crossing, representing an alignment length of approximately 10 km. It is expected that cut-and-cover, drill-and-blast and TBM tunnelling methods will be adopted to suit the geological conditions along the alignment. Contact MTR Corporation, Procurement and contracts department, Mr K F Nam, senior contracts engineer, 4/F MTR Kam Tin Building, 23 Kam Ho Road, Kam Tin, New Territories, Hong Kong, fax +852 22083303. Visit www.mtr.com.hk/eng/tenders/C802%20and%20C803.html 36/08. |
|
|