tunnelintelligence
SICK - gas monitoring       SELI       AMBERG ENGINEERING      
tunnelintelligence
Awards
Germany
North Rhine - Westphalia - de/106
Roads
10.03.2010
Prior information notice of start of award procedures on 27.05.2010 for general safety upgrade and restoration of six road tunnels to RABT 2006 standard, value EUR26.5 million, commencing winter 2010 with Herkulestrasse, value EUR7.54 million. For further information contact Stadt Koeln, tel +49 221221-23647, fax –28715, e-mail zentrales-vergabeamt@stadt-koeln.de. For details of all tunnels involved in this project visit tunnelbuilder archive de/106. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062973-2010. 10/10...
Austria
Brenner - at/16
High Speed Railway
&
Italy
Brenner - it/103
High Speed Railway
10.03.2010
Vicenzetto Srl of Villa Estense have secured the EUR587,987 contract for test drilling and boring work in Brenner Base tunnel. Contact Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062301-2010 and www.vicenzetto.it. ..
Switzerland
Ceneri - ch/14
High Speed Railway
10.03.2010
The CPV consortium, formed by CSC SA (Lugano) and Pizzarotti SA (Bellinzona), signed the EUR43 million contract for the construction of Lot 854 at Vezia, the main lot of Ceneri Base Tunnel, including the south portal, 200 m of cut-and-cover tunnel, as well as drilling, blasting and lining both tunnels along a length of 300 m. Works at Vezia will continue until 2016. Commercial operation of the Ceneri Base Tunnel with scheduled train services is planned to start at the end of 2019. Of the total of 40.19 km of the Ceneri Base Tunnel, at the end of February 2010, 7,673 m, or 19.1%, had been ..
Austria
Linz - at/36
Tramway
10.03.2010
Imtech Austria Anlagentechnik GmbH of Linz have secured the contract for supply, installation and commissioning of ventilation equipment for the tunnel section of the Harter Plateau tramway line. For more, contact Ing. Harald Grogger at Managementservice Linz GmbH in Linz, tel +43 7323400-7982, fax -157982, e-mail h.grogger @ linzag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=059736-2010. 10/10...


Prequalifiers
Italy
National - it/158
Railways
Rete Ferroviaria Italiana SpA is inviting companies to prequalify for civil engineering work on railway tunnels in Italy. Further information and documents from Iacomino Raffaele at Gruppo Ferrovie dello Stato in Milan, tel +39 02637 148-19, fax –20, e-mail dns-qs@rfi.it to whom requests to participate should be sent. Visit
Pakistan
Karakorum - pk/22
Railway
Pre-feasibility study being undertaken by ILF Consulting Engineers for construction of single track railway line along the Karakorum highway between the end of the existing railway network in the south at Havelian and the border between Pakistan and China near the famous Khunjrab Pass in the north.
China
Hong Kong - cn/82
West Island Line
Prequalification underway by MTR for tender reference no 703 for West Island Line SHW to SYP tunnels value EUR30 million with a view to selective invitations to tender being issued in 4Q/2008 for contract award in 3Q/2009. Expressions of interest to Malcolm O’Neill, tel 3921 3383, e-mail moneill@mtr.com.hk Visit www.mtr.com.hk/eng/tenders/new_projects.html 45/08.


Contact Us - maurice@tunnelbuilder.com

Several tunnelbuilder reference editions are now available online. To review

tunnelbuilder demographics in Spanish

Advertise in Spanish!

Press Releases - sam@tunnelbuilder.com

Case Studies

Category1



Contessa ( Download PDF file Download)
Contessa
Traffic Management in Tunnels ( Download PDF file Download)
Training Simulator
AETOS ( Download PDF file Download)
According to the initial plan, the programme of conferences will consist of four sessions that will cover all the different topics related to tunnelling, and particularly the new technologies and innovations that have contributed to the advancement of the tunnelling industry.
Aetos Exhibitors ( Download Word Document Download)
A technical exhibition will host companies and institutions participating in the construction of the above-mentioned projects and others
IWMA Flyer ( Download PDF file Download)
IWMA Fire Suppression
BArcelona Metro Line 9 ( Download PDF file Download)
Map of line 9 Barcelona
Devils Slide ( Download PDF file Download)
Devils Slide Laser
Grand Goulets Pictures ( Download PDF file Download)
View pictures and more text in french
Durango Mazatlan ( Download PDF file Download)
The communication and transport ministry (SCT) awarded this summer three contracts worth a total of MXP8.22 billion to complete the final section of the Durango-Mazatlán highway. The first contract was awarded to a consortium led by Mexican construction firm Omega Corp. with a price tag of MXP3.97 billion.
EuroTap Press Release ( Download)
Earlier this year the European Tunnel Assessment Program EuroTAP reported the worst results for five years. After testing 31 tunnels in 11 countries it was found that every third tunnel failed to make the grade. Results from Norway and Italy were the worst, while those from Austria and Switzerland were positive. Click here for the full text of the press release.

Week 30 2008

Week 30

Atocha Station Photographs
Pictures of Madrids Atocha Stations
ECTN Thermo Portal ( Download PDF file Download)
ECTN Thermo Portal Overview

IWMA

Bekeart

xella

Sandvik

Marioff

Propex

otb

click to view Ceresola TLS company profile

Korea Mould

China Tunnel Summit

Putzmeister

Schoema